No. | Equipment Name | Findings | Parts To be Replaced | Model | Qty. |
3 |
Mud Tank #1 |
Desander & desilter pump power cable missing, tapered tank power cable missing |
Parts container is under clearance. Need to be replaced if we don’t find the cables. |
3*35+1*16mm² | 60m |
Desander & desilter pump control cable missing. |
Parts container is under clearance. Need to be replaced if we don’t find the cables. |
3*1.5mm² | 60m | ||
Control powerline missing. |
Parts container is under clearance. Need to be replaced if we don’t find the cables. |
16*1.5mm² | 10m | ||
Agitator powerline missing. |
Parts container is under clearance. Need to be replaced if we don’t find the cables. |
3*6+1*2.5mm² | 20m | ||
Universal switch damage. |
Parts container is under clearance. Need to be replaced if we don’t find the spares. |
LW5-16B0012/1 | 5 pcs | ||
300A 300A Powerline Bank |
Parts container is under clearance. Need to be replaced if we don’t find the spares. |
300A | 10 pcs | ||
Ex-proof socket damage. | To be replaced. | 200A | 4 pcs | ||
Ex-proof socket damage. | To be replaced. | 150A | 4 pcs | ||
Ex-proof socket damage. | To be replaced. | 15A | 4 pcs | ||
Agitator motor missing. |
To be replaced. |
11kw | 2 pcs | ||
4 | 3# Mud Tank | Aggravated Pump Motor 380V, 55KW, (To replace existing motor 460V) | |||
5 | 3# Mud Tank | EX-proof Socket 150A (3) | |||
6 |
Mud Tank #4 |
Breaker damage. |
Breaker. |
100A | 1 pc |
Breaker damage. | Breaker. | 75A | 1 pc | ||
Contactor damage. | Contactor. | D38-10 | 4 pcs | ||
7 | 4# Mud Tank | EX-proof Socket 15A (2) | |||
8 |
Mud Tank #2 |
Breaker damage. | Breaker. | 100A | 1 pc |
Contactor damage. | Contactor. | D38-10 | 3 sets | ||
9 |
Mud Tank #5 |
Breaker damage. | Breaker. | 125A | 1 pc |
Breaker damage. | Breaker. | 75A | 1 pc | ||
10 | 6# Mud Tank | Cooling Tank Power Socket 100A, Ex-proof (1) | |||
Aggravated Pump Motor | Cable missing. 3x35+1x16 - TBC | ||||
Circuit Breaker | 125A, 75A, 1 for each | ||||
Contactor | CD38-10 (4). w/ Thermal Relay | ||||
11 | 1# Water Tank | Circuit Breaker 60A | |||
12 | 2# Water Tank | Cable 3x2.5mm², 40m | |||
13 | 3# Water Tank | Cable 3x2.5mm², 40m | |||
14 |
Shaleshaker |
Control cable missing. |
Parts container is under clearance. Need to be replaced if we don’t find the cables. |
3*4+1*2.5mm² | 60m |
15 | Taper Tank | Contractor damaged. | Need to be replaced. | D18-10 | 1 set |
16 | Mud Pump |
MP2A safety bottom damaged. MP2A |
safety bottom MP2A |
24V 24V |
|
All Power Cable damage. | 1*271mm² | 300 | |||
17 | rig123.net' target='_blank'>VFD House - to be Dehumidified for 48 hours | A/C Control Panel (2) | |||
18 | Driller’s Cabin |
Ex-proof A/C 1.5, Window Style, 1.5 HP A/C Switch (100-24. Input AC 220-240v ,Output DC 24V,4.5A) |
Ex-proof A/C 1.5, Window Style, 1.5 HP A/C Switch (100-24. Input AC 220-240v ,Output DC 24V,4.5A) |
1.5 | |
开关电源 Switch (100-24. Input AC 220-240v ,Output DC 24V,4.5A) 开关电源 | 100-24. Input AC 220-240v ,Output DC 24V,4.5A | 2 | |||
19 | VFD house | A/C Control Panel (2) | A/C Control Panel (2) | 2 | |
Temperature Sensor damage VFD |
Temperature Sensor | ||||
Smoke detector damage | Smoke Detector | ||||
Air Dryer damage | Air Dryer | 220V | |||
Generator Cabin - Battery damage | Battery | 12V 50Ah | 2 | ||
PLC Cabinet | Inspect driller’s control PLC control cabinet - the control panel was burned. | Control panel , | |||
Test power damaged. | Power socket. | S-350-24 | 2 | ||
Monitor damaged. | Monitor | PDS-115 | 1 | ||
Industry control computer damage. | Industry control computer | IPC-2403 | 1 | ||
备件 | DTI | ||||
CBP | |||||
CUVC | |||||
PSU | |||||
IVI | |||||
IGBT | IGBT | ||||
Busbar Connector |
6ES7 972-0BA50-0XA0 | ||||
6SE7032-1HB87-2DA1 | |||||
BU |
6SE7031-6EB87-2DA1 | ||||
NGT-C2-250A / 1000V | |||||
Voltage Meter |
63L2-V 750V 50Hz | ||||
JBK5-2500VA 400V/220V | |||||
Transformer |
JBK5-630VA 400V/220VAC 50Hz | ||||
SG-100VA 600V/120V | |||||
JBK5-2500VA 600V/120V | |||||
Transformer |
JBK5-630VA 600V/220VAC 50Hz | ||||
Fuse Switch Plug |
RS17 660V 63A | ||||
Voltage Meter |
63L19-V 600V 50Hz | ||||
Current Meter |
63L19-A 2500A 50Hz | ||||
Power Module |
6ES7 307-1EA00-0AA0 | ||||
CPU Module |
6ES7 315-2AG10-0AB0 | ||||
6ES7 953-8LG11-0AA0 | |||||
S-350-24-14.5 | |||||
S-100-24-4.5 | |||||
CP 5611 | 6GK1 561-1AA00 | ||||
32 Point Digital Input Module |
6ES7 321-1BL00-0AA0 | ||||
32 Point Digital Output Module |
6ES7 322-1BL00-0AA0 | ||||
4 Point Analogue Output Module |
6ES7 332-5HD01-0AB0 | ||||
8 Point Analogue Input Module |
6ES7 331-7KF02-0AB0 | ||||
Front Connector |
6ES7 392-1BM01-0AA0 | ||||
ET200 | 6ES7 153-1AA03-0XB0 | ||||
FM350 | 6ES7 350-1AH03-0AE0 | ||||
RS485 | 6ES7 972-0AA01-0XA0 | ||||
Relay | RU2S-D24 | ||||
2301 | |||||
MD 1600V | |||||
110VAC±20% 24VDC/10A | |||||
Fuse Switch Plug | RS17 400V 63A | ||||
3SB3610-2DA11 | |||||
3SB3602-2KA11 | |||||
3SB3752-6BA40 (G) | |||||
3SB3752-6BA20 (R) | |||||
3SB3 744-6BA20 (R) | |||||
3SB3 744-6BA30 (Y) | |||||
(双联,带限位,阻值为5.6KΩ) | |||||
3SB3602-0AA41 (G) | |||||
3SB3603-0AA21 (R) | |||||
81系列 20/5A | |||||
81系列 5/5A | |||||
81系列 250/5A | |||||
81系列 30/5A | |||||
5SJ6 3637 CC20 | |||||
3VT8340-1AA03-0AA0 | |||||
3VT8110-1AA03-0AA0 | |||||
3VT8320-1AA03-0AA0 | |||||
3VT8216-1AA03-0AA0 | |||||
3VU1340-2NK00 | |||||
3VU1340-2MG00 | |||||
3VU1340-2ML00 | |||||
3TS3101-0XM0 | |||||
3TS2910-0XM0+3TX3010-2A | |||||
3TS3010-0XM0+3TX3010-2A | |||||
3TS3311-0XM0+3TX3010-2A | |||||
3WL9 111-0AE05-0AA0 | |||||
1024 | |||||
S3 R-EMV PROFIBUS 2x0.3 外径:8.0±0.4mm | |||||
P3 P-EMV PROFIBUS 2x0.3 :8.0±0.4mm | |||||
S5 R-16A RVVY 4x2.5 :12.5mm | |||||
P5P-16A RVVY 4x2.5 :12.5mm | |||||
S14R RVVY 12x1.0 :14.6mm | |||||
P14P RVVY 12x1.0 :14.6mm | |||||
S20R RVVY 19x2.5 :33mm | |||||
P20P RVVY 19x2.5 :33mm | |||||
S27R RVVY 27x1.0 :18mm | |||||
P27P RVVY 27x1.0 :18mm | |||||
150A | |||||
100A | |||||
200A | |||||
25A | |||||
25A | |||||
22 | Cable searching per drawing, | Motor power cables for RT, MP need to be buy. | |||
RT 1*271mm² | 1*271mm² | 300 | |||
MP 1*271mm²。 | 1*271mm² | 150 | |||
Rest cables verification per drawing and making list to confirm if any purchase is required. - local electrical is working on it. | Need exact length |